Dykon Pipeline Blasting 2020 Texas 3, youtube mp3 indir

İzlenme: 3.473

Dykon Pipeline Blasting 2020 Texas - 3

Aşağıdaki alternatiflere de göz atmak isteyebilirsiniz

Şarkı indir, bedava müzik indir, youtube dönüştürücü

Dykon blasted 170,539 feet of trench rock (32.3 miles) for the 80 mile spread. 948,025 lbs of dynamite was used in under 3 months.

Visit us at http://dykonblasting.com/
  / dykonblasting  
  / dykonblasting  

#Dykon #blasting #pipeline #pipelinework #pipelining #oilandgas #explosives